Jump to content
Search

News

Follow current events in our company. 

  • Published: 25. 3. 2019
  • In category: News
All news

Slovenian Feed-in Support System for Electricity from RES and High-efficiency CHP in 2018

At the end of 2018 the feed-in system included 3.859 power plants with a combined installed capacity of 412 MWe. 

 

 

Support payments were lower than in 2017 (- 6 %); while the total amount of electricity produced was 1 % lower than in 2017. More information in the Periodic Report.

e-nEWS Receive timely updates and exclusive content  Subscribe here.