Published: 25. 3. 2019 In category: News All news Slovenian Feed-in Support System for Electricity from RES and High-efficiency CHP in 2018 At the end of 2018 the feed-in system included 3.859 power plants with a combined installed capacity of 412 MWe. Support payments were lower than in 2017 (- 6 %); while the total amount of electricity produced was 1 % lower than in 2017. More information in the Periodic Report.