Published: 2. 8. 2018 In category: News All news Slovenian Feed-in Support System for Electricity from RES and High-efficiency CHP in the first half of 2018 On 30 June 2018 the feed-in system included 3.879 power plants with a combined installed capacity of 410 MWe. The total electricity production within the support system decreased by 5 % compared to the same period in 2017 (H1 2018 vs. H1 2017). The difference in support payments was negative 11 %. More information available in the Periodic Report.