Jump to content
Search

News

Follow current events in our company. 

  • Published: 25. 10. 2018
  • In category: News
All news

Slovenian Feed-in Support System for Electricity from RES and High-efficiency CHP in the first nine months of 2018

On 30.9.2018 the feed-in system included 3.866 power plants with a combined installed capacity of 409,5The trend of rising payments has stabilized in 2015. 

The total electricity production within the support system decreased by 5% compared to the same period in 2017. The difference in support payments was 7%. MWe. More information.

e-nEWS Receive timely updates and exclusive content  Subscribe here.