Published: 25. 10. 2018 In category: News All news Slovenian Feed-in Support System for Electricity from RES and High-efficiency CHP in the first nine months of 2018 On 30.9.2018 the feed-in system included 3.866 power plants with a combined installed capacity of 409,5The trend of rising payments has stabilized in 2015. The total electricity production within the support system decreased by 5% compared to the same period in 2017. The difference in support payments was 7%. MWe. More information.