Jump to content
Search

News

Follow current events in our company. 

  • Published: 13. 8. 2020
  • In category: News
All news

Feed-in system in first half of 2020

At the end of June 2020 Slovenian feed-in system included 3.854 power plants with a combined installed capacity of 411,4 MWe.

he total electricity production within the support system increased by 1,6 % compared to the same period in 2019 (H1 2020 vs. H1 2019). The difference in support payments was positive by 2,7 %. More information in Periodic Report.

e-nEWS Receive timely updates and exclusive content  Subscribe here.