Jump to content
Search

News

Follow current events in our company. 

  • Published: 31. 7. 2019
  • In category: News
All news

Slovenian Feed-in Support System for Electricity from RES and High-efficiency CHP in the first half of 2019

At the end of June the feed-in system included 3,864 power plants with a combined installed capacity of 414 MWe.

 

The total electricity production within the support system increased by 4 % compared to the same period in 2019 (H1 2019 vs. H1 2018). The difference in support payments was negative by 6 %.

More information is available in the Periodic report.

e-nEWS Receive timely updates and exclusive content  Subscribe here.