Published: 6. 6. 2018 In category: News All news Slovenian Feed-in Support System for Electricity from RES and High-efficiency CHP in the first quarter 2018 On 31.3.2018 the feed-in system included 3.877 power plants with a combined installed capacity of 414 MWe. The total electricity production within the support system reduced by 8 % compared to the same period in 2017 (Q1 2018 vs. Q1 2017). The difference in support payments was negative (-20 %) as well. More information is available in the periodic report.