Published: 27. 3. 2020 In category: News All news Slovenian Feed-in Support System for Electricity from RES and High-efficiency CHP in 2019 At the end of 2019 the feed-in system included 3.858 power plants with a combined installed capacity of 417 MWe. The support payments were lower than in 2018 (- 9 %); while the total amount of electricity produced increased by 1 % in comparison to 2018. More information is available in Periodic Report for 2019.