Published: 31. 7. 2019 In category: News All news Slovenian Feed-in Support System for Electricity from RES and High-efficiency CHP in the first half of 2019 At the end of June the feed-in system included 3,864 power plants with a combined installed capacity of 414 MWe. The total electricity production within the support system increased by 4 % compared to the same period in 2019 (H1 2019 vs. H1 2018). The difference in support payments was negative by 6 %. More information is available in the Periodic report.