Published: 12. 11. 2021 In category: News All news RES and CHP Support Scheme in the first nine months At the end of September, the Slovenian feed-in system included 3.840 power plants with a combined installed capacity of 414.8 MWe. In this period, about 2.6 percent more subsidies were paid than in the same period last year, while 4.2 percent more electricity was produced. The average amount of paid support amounted to 137.4 EUR per MWh, which was slightly lower than the average paid support in the same period in 2020. More information available here.