Jump to content
Search

News

Follow current events in our company. 

  • Published: 6. 6. 2018
  • In category: News
All news

Slovenian Feed-in Support System for Electricity from RES and High-efficiency CHP in the first quarter 2018

On 31.3.2018 the feed-in system included 3.877 power plants with a combined installed capacity of 414 MWe.

The total electricity production within the support system reduced by 8 % compared to the same period in 2017 (Q1 2018 vs. Q1 2017). The difference in support payments was negative (-20 %) as well. More information is available in the periodic report.

e-nEWS Receive timely updates and exclusive content  Subscribe here.