Jump to content
Search

News

Follow current events in our company. 

  • Published: 30. 5. 2019
  • In category: News
All news

Slovenian Feed-in Support System for Electricity from RES and High-efficiency CHP in the first quarter 2019

At the end of March there were 3,861 power plants with a combined installed capacity of 412 MWe included in the feed-in system. 

The total electricity production within the support system increase by 7 % compared to the same period in 2018 (Q1 2019 vs. Q1 2018). The difference in support payments was positive (+ 5 %) as well. More information is available here.

e-nEWS Receive timely updates and exclusive content  Subscribe here.